QuadraNet - Dallas - Network Infrastructure Maintenance
Scheduled Maintenance Report for QuadraNet
Completed
The scheduled maintenance has been completed.
Posted Dec 21, 2018 - 01:45 PST
Update
New copper switch has been placed inside the cabinet and is being verified.
Posted Dec 21, 2018 - 01:30 PST
Verifying
Connectivity has been partially restored in Dallas on the new routing appliance(s). Further checks are being made, all customer connectivity should at this time be restored. While we work through to finalize the new deployment and commit changes, you may see partial degradation of network performance.
Posted Dec 21, 2018 - 01:15 PST
Update
New Routing appliance(s) have been racked and cabled, traffic is currently being checked on our edge.
Posted Dec 21, 2018 - 01:04 PST
Update
New CORE has been racked and cables are being placed back into their respective ports.
Posted Dec 21, 2018 - 00:52 PST
Update
CORE01 has been fully deracked at this time.
Posted Dec 21, 2018 - 00:23 PST
Update
CORE01 blades have been tagged and removed from the chassis to prepare for deracking.
Posted Dec 21, 2018 - 00:10 PST
Update
DAL-CORE01 has been powered offline.
Posted Dec 21, 2018 - 00:05 PST
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Dec 21, 2018 - 00:03 PST
Scheduled
EMERGENCY NETWORK MAINTENANCE - SERVICE IMPACTING

Location: Dallas
Date: Friday, December 21st, 2018
Start Time: 2:00AM CST
End Time: 3:00AM CST
Expected Outage: 60 Minutes

Risk: Network connectivity while the core router is being replaced.

Description:
QuadraNet will be performing a network maintneance in order to upgrade our core networking infrastructure. This will be inclusive of replacing our existing legacy core with a much more robust routing appliance.

This network maintenance will benefit customers by offering a wider variety of growth options, improved latency/connectivity and improved reliability.

Two of QuadraNet's senior network engineers will be on-site in Dallas performing the maintenance to ensure it is completed as expeditiously as possible.

If you have any questions regarding the maintenance at any point, please contact our support department at support@quadranet.com or 1-888-5-QUADRA.

We appreciate your understanding and patience during this maintenance and welcome all feedback.
Posted Dec 21, 2018 - 00:03 PST
This scheduled maintenance affected: DAL-C1.